Guidance for major / important modifications to Distribution Boards in Existing Installations or Upgrading Customer Meter tails
RECs working on installations which are more than 10 years old shall issue a recommendation that an Electrical Installation Condition Report (EICR) or Periodic Inspection Report (PIR) shall be carried…
Focus on Photovoltaic Installations
What to look out for in PV systems: AC side Test all AC circuits to the requirements of IS10101 Chapter 6. DC Side Are you carrying out these DC tests?…
Safety Notices
Click on the relevant topic below to view further information. Product Recall – Trotec Digital Multimeter Model BE48 Product Alert – LSIS miniature circuit breaker Recall of Hager 10kA Miniature…
Notice of Potential Hazard
Situations may arise where a Registered Electrical Contractor (REC) carrying out installation works observes a potential hazard. The potential hazard may not be associated with the REC’s contract of works…
Cooker Installations (Domestic)
We are aware that cookers are now being installed with loadings exceeding 10kW. Please be aware of the National Rules for Electrical Installations (ET101) requirements when designing circuits for such…
Amendments to the National Rules for Electrical Installations – ET101
The relevant amendments to the ET101: 2008 National Rules for Electrical Installations – 4th Edition can be accessed by clicking here.